Dahan Construction Elevator

Dahan Construction Elevator

SC200/200 CZPT CZPT Three-motor Travel and With Velocity 33m/min

  

SC200/two hundred 3-motor Worm Reducer Kind CZPT Performance Parameter Checklist
No. Merchandise Device Parameter Note
one Reted Load kg 2 x 2000 CZPT cage
two Install/disassemble Reted load kg 2 x one thousand CZPT cage
3 Lifting Velocity m/min 33 Reducer Ratio 1:16
four Max. Height m two hundred  
five Cage Dimension(LXW) m x m 3×1.five/three.2×1.5  
6 Length In between Foundation And Cage Base m .forty six  
7 Distance among Anchor m ≤9  
8 Free of charge End Peak m ≤9  
9 Electrical power Offer V 380V±5%  
10 Motor Electricity kw 2x3x11 JC=twenty five%
11 Rated Current A 2x3x24  
twelve Basic safety Device Model   SAJ40-1.2A  

ZheJiang CZPT CZPT CZPT Co., Ltd was established in Dec. 2000, specialized in manufacturing tower cranes and building elevators, we are pioneer of Chinese tower crane market.

At existing our items cover nine sequence and much more than twenty designs, this sort of as QTZ50, QTZ63, QTZ80, QTZ125, QTZ160, QTZ250, QTZ315, QTZ500, SC200/200, the specialized indicators have achieved the major stage at residence and abroad.

Substantial good quality
Uncooked content is the basis of product and the initial hurdle to ensure quality. CZPT tower crane bulk acquire steel straight from huge metal factories like Baosteel and Wisco, increase the basic safety of solution.

                                
Initial course elements
Very first-course product composed by 1st-class elements, CZPT usually insisted to use the first course components, as Fangyuan assist, Schneider electric element and so forth.

Advanced processing gear
We have the most advanced processing equipment, this sort of as the large laser cutting device,CNC plasma cutters, CNC drilling equipment, lathes, milling machines, sawing devices and other folks. 

Robotic computerized welding system and put up-weld general processing gear

We are the very first company to adopt mast sections and main chord robot welding program in the identical business in China. This system is reliable in the overall performance, with high perform performance and substantial computerized diploma. The welding good quality much more trustworthy and resilient.

The main limbs of the mast section, the turntable and other factors are all processed and drilled after welding to increase the accuracy.

Computerized impeller blasting and spraying assembly line
The big framework elements are dealt with impeller blasting before spraying. That remove metal surface oxides and welding spatters successfully, eliminates the internal pressure creating in welding approach, increases the parts’ anti-figure energy and steel surface area hardness, increases portray adhesion and lengthen the service daily life of the merchandise maximizes efficiency and saves strength

Strict high quality evaluation
CZPT have the stringent high quality take a look at, uncooked material examination, test of welding, checking welding top quality of visual appeal, assembly and adjustment of jib, tower head and pivot in manufacturing unit.

Protection defense
Completely safety security devices improves the safety, fat limiters, adopt the advanced pull-ring construction from abroad, second adopt bow-board mechanical type which can be used in serious wild setting.

We have professional packing person to set the tower crane in the container or on to the truck.

 

FAQ

Q1: How numerous countries have you exported your products to?
A1:Our tower cranes experienced exported to more than 20 nations, this kind of as Korea, Vietnam, Philippines, Indonesia, India, Sri Lanka, Cambodia, Russia, Kazakhstan, Brazil, Algeria, Ukraine, Turkey etc.

Q2: How to verify a suited building hoist design?
A2: My expensive friends, remember to inform us the underneath basic parameters to affirm hoist product:
a. Creating top.
b. Max load potential .
c. Other Special needs

Q3: Can you put in the  hoist for us 
A3: Indeed, we can send a single engineer to your region for putting in, but you ought to bear the expense. 

This fall: Warranty time?
A4: twelve month from the shipping and delivery day (apart from the sporting areas).

Any other queries, please give us a information, hope can cooperate with you! and welcome to check out us!

Dahan Construction Elevator