High Tensile F shop orged Chain and Trolley for Conveying Sys wholesaler tem

Product Description

1.   Product Application Fields          
Construction CZPT ry                  
Agriculture CZPT ry                 
Mining Equipment                    
High-Speed Rail                       
Automobile Industry                   
Petrochemical                         
Energy                                  
Shipbuilding                          
General CZPT ry                    
2.  Research and CZPT                                              
   CAD Software                                                 
   3D Solid Modeling                              
DEFORM Simulation Software                        
3.  Material                               
Carbon Steel                           
Alloy Steel                             
Stainless Steel                          
Aluminum                             
4.  Heating Equipment                       
Electric Intermediate Frequency CZPT     
5.   Forging Equipment                     
2500Ton Double Disc Friction Press        
1600Ton Double Disc Friction Press        
1000Ton Double Disc Friction Press        
630Ton Double Disc Friction Press          
400Ton Double Disc Friction Press          
Sawing CZPT                            
Shot Blasting CZPT                      
Air Hammer                            
Punch                                   
6.  Forging CZPT ght Range:0.05kg-100kg          
7.  Heat Treatment Equipment                                
Electric heating furnaces with precise computerized        
temperature control to achieve desired hardness and     
mechanical properties.                           
 
Water/Oil/Polymer quenching pool with mechanical  
Propeller agitation.
Induction/Flame hardening equipment.               
8.  Machining Equipment                              
CNC Center                                      
CNC Milling CZPT                               
CNC Drilling CZPT                               
CNC Lathe                                        
Grinding CZPT                                    
Wire Cutting CZPT                               
Electric Pulse CZPT                              
EDM                                             

9.Inspection Equipment
Direct-Reading Spectrometer                              
Hydraulic CZPT Testing CZPT                                                  
Rockwell Hardness Tester                                
Brinell Hardness Tester                                 
Vickers Hardness Tester                                
Metallographic Analyzer                                   
   CZPT ic Particle Tester                                    
Ultrasonic Tester                                       
CMM                                                 
Infrared Thermometer                                   
10.Certification of Quality Management System   
ISO9001:2008                                        
ISO/TS16949                                          

FAQ:  

1. Are you a genuine manufacturer?Yes, all products showed in CZPT website are produced in CZPT ISO9001:2015 certified factory; We are also a company registered by CZPT CZPT s with the right to export and import.  

2. I want to keep CZPT design in confidence; can we sign NDA?Sure, to protect CZPT ers’ profit is CZPT obligatory responsibility, signed NDA would be valid to both of us.. 

3. What should I offer to get your quotation?Please offer us your detailed information for the product, such as drawings with 2D/3D by software Pro/E, CZPT CAD, SolidWorks, UG etc; as well as materials, surface treatment, quantity, package. Any special requirements should be highlighted especially for tolerance.  

4.How CZPT does it take to receive samples?
20 working days,the lead time is the general production period and does not include the transportation time.
we can supply free samples with less quantity,but CZPT ers need to pay shipping cost.

5.How CZPT is the manufacturing lead time?
Mass Production:30-45 working days after sample approval by yours.The lead time is the general production period without the transportation time.
We could make some special production arrangement effectively if CZPT er has urgent need.

6.How CZPT does it take to ship goods from CZPT by sea?
It takes about 5 weeks to CZPT pean ports plus 1 week CZPT s clearance, so you can get the container within 6 to 7 weeks.It takes about 2 weeks to east coast and 3 weeks to west coast US ports.All sea goods are shipped from HangZhou Port.

7.How CZPT does it take to ship goods from CZPT by air?
It takes about 7 days to all major destinations.

8.What are the payment terms?
Payment terms are negotiable and will improve for CZPT term CZPT ers.During the initial stages, we request 50% of tooling fee in CZPT with the balance payable on acceptance of samples.Production orders can be negotiable.We prefer 30% deposit and the balance by T/T before sails.But sometimes T/T15 days after sails would also acceptable.

9.New product development process
Got tooling order and sample order with 50% deposit—Hold a meeting with the relation dept.To ensure the developing schedule—Design mould, fixture and gauge and making them in CZPT factory—mould.fixture and gauge making—producing samples—approved from CZPT er-purchasing material-forging-heat treatment-shot blasting-machining-Inspection-package—delievry

10.Which countries do you export to?
Now mainly export to U.S.A, Germany, France, CZPT , UK, Brazil, Swedish, Japan, Korea, Middle east of Asia, Thailand and so on.

11.Can we visit the factory to conduct an audit?
Yes, you are welcome to visit CZPT  factory.

12.How to handle the complains?
–If happen any complaints after delivery,please just show us photos and detail compliants points, we will check with the production department and QC department Immediately and give you best solving solution which agreed by both of us,moreover we will bear all the cost (including shipping cost)..